Mar 222016
 
Bikes in the 2017-2022 Capital Budget

Wow, it’s been more than ten years since I started poring over bike budgets.  I still remember analyzing the 2005-2010 budget.   That’s so long ago that some of the projects in that budget are actually complete! (but many aren’t).  It’s so long ago that two-way cycle tracks were still called bike paths. Seriously, the County Executive’s recommended 2017-2022 Capital Budget (technically the “FY17 Recommended Capital Budget and FY17-22 Capital Improvements Program”) is a solid improvement over budgets from ten years years ago.  Support for bicycling has never been stronger in the county, thanks to growth in ridership and attitudinal shifts in county government.  But the county still has a long way to go. The capital budget covers six years but […]

 Posted by at 3:14 pm on Mar 22, 2016  Comments Off on Bikes in the 2017-2022 Capital Budget
Apr 012015
 
Bradley Blvd. project design presented

Montgomery County DOT convened a public workshop on the Bradley Boulevard Improvements project on March 23, 2015.   The open-house style workshop allowed people to view project plans, ask questions, and make comments to DOT staff. Project Details The project would improve the segment of Bradley Blvd from Wilson Lane to Glenbrook Road , including the Wilson Lane intersection: The project would convert Bradley into a “dual bikeway” having both bike lanes and an 8′ shared use path.  But it’s not just a bikeway project.  It would make major drainage improvements and add an additional sidewalk, representing a significant share of the cost.  For additional information, see the MCDOT official project description. The completed cross section would include: 5′ wide […]

Mar 302015
 

The Carl Henn Millennium Trail along East Gude Drive is a notably unsafe and unappealing section of that well-used trail.  But it would be much improved if the county could convert it into a legitimate two-way cycle track with a separate sidewalk (like on Woodglen Drive in White Flint).  More realistically, it could be reconfigured as a sort of pseudo-cycle track that permits pedestrian use. Two problems contribute to the lack of safety on the Millennium Trail between Rockville Pike and Norbeck Road: Lack of a safety buffer or barrier between the trail and the street Many busy driveway crossings, often in very close proximity to each other As shown here, there simply isn’t enough separation between the trail and […]

Jan 132015
 
Woodmont Ave bikeway options north of Old Georgetown Road

Montgomery County is looking to construct a cycle track (aka protected bike lanes) on Woodmont Avenue between Old Georgetown Road and Bethesda Ave.  The project would allow cyclists to ride either north or south on Woodmont in some combination of cycle tracks and conventional bike lanes.  See this detailed analysis of the various options.  Much of Woodmont is a one-way street, so any facility allowing northbound travel would be a definite improvement, protected or otherwise. A key question is what will the rest of Woodmont Ave look like?  What bike accommodations will it get?  I’m referring to the half-mile long stretch of Woodmont Ave from Old Georgetown Road to Battery Lane, which is a two way street.  The future design […]

Jan 112015
 
Woodmont Ave cycle track options

The Montgomery County Department of Transportation is considering construction of a cycle track, also known as protected bike lanes, on Woodmont Avenue in Bethesda.  The project would require removal of one lane (often used for parking) between Old Georgetown Road and Hampden Lane.  The county is suggesting a two-way cycle track on the west side of Woodmont, but this might not be the best option. On a two-way street, one-way cycle tracks are superior to two-way cycle tracks because they make for much simpler intersections and avoid putting cyclists on the “wrong” side of the street (going the wrong direction for the side of the street they’re on, catching drivers by surprise).  On a one-way street, a two-way cycle track […]

 Posted by at 12:21 am on Jan 11, 2015  Comments Off on Woodmont Ave cycle track options
Jan 102015
 
MoBike position on cycle tracks

Statement by MoBike (Montgomery Bicycle Advocates) on cycle tracks: Cycle tracks, sometimes called separated or protected bike lanes, are one of the most promising new bike facility types to be implemented in the U.S. in recent years. Because cycle tracks physically separate cyclists from car traffic, they appeal to the “interested but concerned” category of bicyclists who would ride their bikes more if they felt safer doing so. The societal benefits of getting more people using their bikes for transportation, as well as the prospect of fewer deaths and injuries, make it worthwhile to provide cycle tracks in many contexts.  However, they are not completely without drawbacks, as noted below, so their suitability should be determined on a street-by-street basis.  […]

Nov 302014
 

The Montgomery County Council just passed Bill 33-13 entitled Urban Road Standards and Pedestrian Safety Improvements. The bill makes modest changes to the county’s road design standards to make our streets better and safer places for bicyclists and pedestrians.  It does this primarily by calling for measures to reduce motor vehicle speeds.  County road standards are codified in laws and regulations known collectively as the Road Code. The enacted bill updates relevant portions of the Road Code, either by changing the law directly or directing the County Executive to modify relevant regulations. Here’s the executive summary of the bill’s stipulations. Through lanes and turn lanes on urban roads must be no wider than 10′ unless next to parking or a […]

 Posted by at 12:56 pm on Nov 30, 2014  Comments Off on Safer road standards adopted by the county
Nov 012014
 
Woodglen Drive gets Montgomery County's first cycle track

Woodglen Drive in North Bethesda now features Montgomery County’s first cycle track.  The county Department of Transportation deserves kudos for its willingness to support this type of facility.  The implementation is not without its shortcomings, but growing pains are to be expected as the county begins implementing cycle tracks, also known as protected bike lanes.  Moreover, the cycle track is not 100% complete (it will be by the end of November hopefully).  The primary problems seem to be intersection design and the proximity of parking to the cycle track, creating the potential for cyclists to collide with suddenly opened car doors.  Moving forward, there are steps the county can take to improve this facility and to create better cycle tracks […]